Capital Projects / Commissioning / Post-Construction / Commission Equipment task
Commissioning Equipment: Floor Plans
The Floor Plans tab of the Commission Equipment task shows the floor plan drawing for the selected equipment asset. The Equipment Asset is highlighted in yellow on the drawing. When you mouse over the equipment asset, a pop up window shows details for the equipment. The Equipment List Details pane at the bottom of the view summarizes information for the equipment.
The following shows the floor plan drawing for an equipment asset:
Back To Commission Equipment task.